The Prime Quality Promise
Prime Microgrid applies a structured commissioning and documentation process appropriate to each project.
Installation Quality
What Is the Prime Installation Score?
Each project phase receives an internal quality score calculated from required evidence and documented quality-control checkpoints. A minimum score of 90% is required before the installation team can advance.
The score reflects whether all required photos have been captured, all commissioning steps have been completed, all system labels are in place, and all documentation is ready for the inspector.
Items that do not meet the score or review criteria must be corrected before progression. The score is an internal quality-control measure, not a legal certification or guarantee of inspection approval.
Phase Progression Threshold
A phase must meet the 90% internal threshold and applicable review criteria before work advances.
Commissioning
What Our Technicians Verify On-Site
Commissioning is the structured process of verifying that every component of your energy system is properly installed, configured, and performing as designed.
Each step is completed, verified, and recorded in our system before the project is closed out.
Documentation
Why Every Stage Is Photographed
Photo documentation isn't just for our records — it protects you. A complete visual record of your installation means there's never a question about what was done and how it was done.
These photos support your permit inspection, warranty documentation, insurance records, and future service needs. If a question ever comes up, the evidence is already on file.
Our AI system also reviews key photos to flag anything that may need a second look — adding another layer of quality assurance beyond the technician's own verification.
Required Photo Stages
Inspection Readiness
What "Inspection Ready" Means for You
Inspection readiness means the assigned documentation and internal review steps are complete. Final interpretation, inspection and approval remain with the applicable adopted code, local amendments and Authority Having Jurisdiction.
Permit Inspection Prepared
Documented work is reviewed against configured project requirements to support the local building department's inspection.
Utility Interconnection Ready
System configuration, metering, and safety disconnects are verified and configured for your utility's interconnection requirements.
Documentation Complete
Complete photo documentation, commissioning records, and system settings are on file — supporting both inspection and warranty requirements.
Quality Confirmed
The internal score records completion of assigned quality checkpoints and supports commissioning review; it does not guarantee an inspection or operating outcome.
Our Promise to Every Customer
Prime Microgrid uses documented commissioning, phase evidence, internal quality scoring and correction workflows appropriate to each project. Learn more about the AI-enabled installation quality platform that supports this process.
Final code interpretation, inspection and approval remain subject to the applicable adopted code, local amendments and the Authority Having Jurisdiction.