Transfer Time
The duration between utility-grid failure and backup-power activation at a property's electrical panel. Transfer time and its effect on connected loads depend on the selected transfer equipment, inverter or generator platform, system design, configuration, and operating conditions. Product specifications and commissioned test results should be reviewed for each project.
Related Terms
The act of a power system continuing to operate and supply power to a local area after the surrounding utility grid has disconnected. In residential microgrids, intentional islanding is the core resilience feature — when the utility grid fails, the system islands automatically and continues powering the property. Anti-islanding is a safety requirement in grid-tied systems: inverters must detect grid failure and disconnect from the utility to prevent backfeeding live power onto de-energized utility lines, protecting utility workers. Microgrid-grade systems handle both: safe disconnection from the grid and immediate transition to island operation.
On-site electrochemical energy storage that allows a property to store electricity and discharge it on demand. In a microgrid, storage may support backup operation, energy buffering, and reduced generator runtime. Transfer behavior depends on the selected equipment, system design, and operating conditions. Storage is sized in kWh for energy capacity and kW for power output; both metrics affect supported loads and duration.
Everything Stays On.
Customer-sited generation + energy storage + backup generation + intelligent controls = whole-property power continuity.
Request System DesignYour information stays with Prime Microgrid. We do not sell your request to contractor networks or lead marketplaces.