Back to Glossary

Transfer Time

The duration between utility-grid failure and backup-power activation at a property's electrical panel. Transfer time and its effect on connected loads depend on the selected transfer equipment, inverter or generator platform, system design, configuration, and operating conditions. Product specifications and commissioned test results should be reviewed for each project.

Everything Stays On.

Customer-sited generation + energy storage + backup generation + intelligent controls = whole-property power continuity.

Request System Design

Your information stays with Prime Microgrid. We do not sell your request to contractor networks or lead marketplaces.